摘要
随着我国城市化进程的发展,地铁建设也进入了快速发展期。当已建地铁线路穿越建设用地,有可能会影响到隧道上方的建设活动。针对这个问题,文章以某商业综合体的设计为例,提出了3种不同的解决方案。
With the development of urbanization in China,subway construction has entered a period of rapid development.When the existing subway line crosses the construction land,it may affect the construction activities above the tunnel.To solve this problem,this paper takes the design of a commercial complex as an example,and puts forward three different solutions.
作者
武锐
WU Rui(Nanjing Yangtze River Urban Architectural Design Co.,Ltd,Nanjing Jiangsu 210006 China)
出处
《江苏建筑》
2020年第3期40-42,53,共4页
Jiangsu Construction
关键词
地铁上盖
TOD
商业综合体
大跨度
预应力转换梁
subway top cover
TOD
commercial complex
large span
prestressed transfer beam