期刊文献+

浅析DFM方法在铝合金型材箱体加工中的应用与实践

Application and Practice of DFM Method in Aluminum Alloy Profile Box Processing
下载PDF
导出
摘要 新能源汽车动力电池的关键部件即下箱体一般采用铝合金型材焊接工艺。由于这种材料具有质量轻,易加工的优点而得到了广泛应用。“面向制造的设计(Design for Manufacturing),简称DFM”的方法是要求在设计的初始阶段就需要考虑制造。体现在电池系统下箱体的关键工序,如型材挤压、型材零件加工、搅拌摩擦焊、装配等,要求在设计阶段要考虑易加工性和易装配性,同时满足更低的加工成本,更短的时间、更高的质量。文章通过类比和试验的分析方法,具体阐述了这一理论的实践过程。 Aluminum alloy profile welding process is generally used for the lower box,the key component of new energy vehicle power battery.Because of the advantages of light weight and easy processing,this material has been widely used.The method of"design for manufacturing"(DFM)requires that manufacturing should be considered in the initial stage of design.The key processes of the box body under the battery system,such as profile extrusion,profile parts processing,friction stir welding,assembly,etc.,are required to consider the ease of processing and assembly at the design stage,while meeting the requirements of lower processing cost,shorter time and higher quality.In this paper,the practical process of this theory is expounded by means of analogy and experiment.
作者 胡霞飞 林志宏 曹勇 Hu Xiafei;Lin Zhihong;Cao Yong(Hefei Gotion High-tech Power Energy Co.,Ltd.Engineering Research Institute,Anhui Hefei 230000)
出处 《汽车实用技术》 2020年第15期178-180,共3页 Automobile Applied Technology
基金 国家重点研发计划(2016YFB0100304)
关键词 面向制造的设计 DFM 铝合金型材 型材挤压 搅拌摩擦焊 电池箱体 动力电池 Design for manufacturing DFM aluminum alloy profile profile extrusion friction stir welding battery box power battery
  • 相关文献

参考文献7

二级参考文献27

  • 1吴向红,赵国群,栾贻国,马新武.铝材长方形空心管挤压过程数值模拟与模具结构优化设计[J].机床与液压,2006,34(11):20-23. 被引量:43
  • 2巩水利,姚伟,Steve Shi.铝合金激光深熔焊气孔形成机理与控制技术[J].焊接学报,2009,30(1):60-62. 被引量:24
  • 3栾国红.汽车制造新技术——搅拌摩擦焊[J].现代零部件,2006(5):76-76. 被引量:2
  • 4刘会杰,潘庆,孔庆伟,唐旭东,苏琳,李学军,孙静波,杨国锋.搅拌摩擦焊焊接缺陷的研究[J].焊接,2007(2):17-21. 被引量:44
  • 5[3]TSENG M M,DU X H. Design by customers for mass customization products[J]. Annals of the CIRP,1998,47(1):103-106.
  • 6[6]HVAMY L.A procedure for the application of product modeling[J]. International Journal of Production Research,2001, 39(5):873-885.
  • 7[1]Blazewicz J, Leastra J K, Kan A H G R. Scheduling subject to resource constraints:classification and complexity. Discrete Applied Mathematics, 1983, 5:11~24
  • 8[2]Downlatshahi S, Ashok M S. Design optimization in concurrent engineering:a team approach. Concurrent Engineering-Research and Applications, 1997, 5:145~154
  • 9[3]Peter B L, Feng Liu, Bryan M. Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research, 1999, 113:575~592
  • 10[4]Todd D S, Sen P. Distributed task scheduling and allocation using genetic algorithms. Computers & Industrial Engineering, 1999, 37:47~50

共引文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部