7Lennon B A,Maxwell S D,Rawles J M.Analysis for running and installation of marine risers with end-assemblies[A].The proceedings of international conference on computational methods in marine engineering[C].Barcelona:International Association for Computational Mechanics,2005.
8API RP 16Q-1993.Recommended practice for design selection operation and maintenance of marine drilling riser system[S].
9Guesnon J,Galliard C,Richard F.Ultra deep-water drilling riser design and relative technology[J].Oil & Gas Science and Technology,2002,57(1):39-57.
10Ambrose B D,Grealish F,Whooley K.Soft hangoff method for drilling risers in ultra deep water[A].OTC 13186,2001.