肯尼亚斯瓦克大坝项目位于肯尼亚东南部,是通过修建一座混凝土面板堆石坝蓄水,开发河水资源用以供水、发电和灌溉多功能一体化的工程。苏州中材建设有限公司负责施工的溢洪道土石方开挖,涉及溢洪道两边边坡支护技术。文章详细介绍了该工程的边坡支护施工过程,提出了其施工质量保证措施和支护工程质量通病处理工艺及措施。
The Swak dam project in Kenya is located in the southeast of Kenya.Through the construction of a concrete face rockfill dam for water storage,the river water resources are developed for the multi-functional integration project of water supply,power generation and irrigation.Suzhou Sinoma Construction Co.,Ltd.is responsible for the earthwork excavation of the spillway,involving the slope support technology on both sides of the spillway.This paper introduces the construction process of the slope support in detail,and puts forward the construction quality assurance measures and the treatment process and measures for the common quality problems of the support engineering.
作者
邓强
裴占龙
田青青
Deng Qiang;Pei Zhanlong;Tian Qingqing(Suzhou Sinoma Construction Co.,Ltd.,Kunshan,215300,China)
出处
《水泥工程》
CAS
2020年第3期78-81,共4页
Cement Engineering
关键词
边坡支护
大坝工程
喷锚
混凝土
slope constrcution
dam project
spray anchor
concrete