水泥厂余热发电对系统短路电流的影响及限制措施

Influence of waste heat power generation on short circuit current of cement plant
下载PDF
导出
摘要 某些旧水泥厂设计时未考虑短路电流余量,余热发电与水泥线总降压站系统并网运行后,最大短路电流会超过断路器的遮断容量,会对水泥厂原有电力系统造成损害。为了保证系统的安全运行需采取相应的限流措施保证电力设备安全,以伊拉克MASS集团25 MW余热发电改造项目为例,说明采用限流电抗器,采用快速限流装置和改变接线方式这三种不同限流方案的应用结果。 In the design of some old cement plants, the residual short-circuit current is not considered. After the waste heat power generation and the general step-down station system of the cement line are connected to the grid, the maximum short-circuit current will exceed the breaking capacity of the breaker, which will cause damage to the original power system of the cement plant. In order to ensure the safe operation of the system, corresponding current limiting measures should be taken to ensure the safety of power equipment.Taking the 25 MW waste heat power generation reconstruction project of mass group in Iraq as an example, the application results of three different current limiting schemes, i.e. adopting current limiting reactor, adopting fast current limiting device and changing wiring mode, are illustrated.
作者 李传祥 邓国平 Li Chuanxiang;Deng Guoping(Sinoma International Engineering Co.,Ltd.,Nanjing,211100,China)
出处 《水泥工程》 CAS 2020年第2期60-62,68,共4页 Cement Engineering
关键词 余热发电 短路电流 限流措施 waste heat power generation short circuit current limiting
  • 相关文献

参考文献2

二级参考文献2

  • 1王维俭 侯炳蕴.大型机组继电保护理论基础[M].北京:水利电力出版社,1988年..
  • 2朱声石.高压电网继电保护原理与技术[M].北京:中国电力出版社,1995..

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部