灌注桩后注浆技术应用研究及承载力影响分析 被引量:2

Post grouting technology and its influence on the bearing capacity of bored piles
下载PDF
导出
摘要 对后注浆技术未能大幅提高灌注桩单桩承载力的工程个案展开分析研判,得出注浆过程控制不力是导致单桩承载力不足的主要原因。严格注浆管、射浆管、逆止阀制作质量管控与安装及注浆过程控制是能否成功注浆进而提高承载力的关键因素。工程案例中对承载力欠缺的区域进行了补桩处理,补桩时规范注浆装置制作、加强注浆过程管控,在补桩达到龄期后进行了静载试验,结果表明其单桩竖向极限承载力满足设计要求。 This paper studies a field case where post grouting technology failed to greatly improve the bearing capacity of the single pile,and concludes that the main cause for the insufficient bearing capacity of the single pile is the poor control of the grouting process.Strict quality control and installation of the grouting pipe,jet grouting pipe and check valve as well as the grouting process control are the key factors for successful grouting,hence improvement of the bearing capacity.In the above field case,the area with insufficient bearing capacity was treated by supplementary piles.During construction of the supplementary piles,the production of the grouting device was standardized and the control of the grouting process was strengthened.After the supplementary piles reached the aging period,the static load test was carried out,and the results showed that the bearing capacity of the supplementary piles met the design requirements.
作者 胡朝彬 宋冠樟 片磊 贺占海 张娜 李广元 高承成 HU Chaobin;SONG Guanzhang;PIAN Lei;HE Zhanhai;ZHANG Na;LI Guangyuan;GAO Chengcheng(Tianjin North China Geological Exploration Bureau, Tianjin 300170, China;Tianjin Huakan Foundation Engineering Testing Co., Ltd., Tianjin 300170, China)
出处 《探矿工程(岩土钻掘工程)》 2020年第7期100-105,共6页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 灌注桩 后注浆技术 注浆器开阀 静载试验 单桩竖向极限承载力 bored piles post grouting technology opening of grouting valve static load test ultimate vertical bearing capacity of single pile
  • 相关文献

参考文献11

二级参考文献73

共引文献100

同被引文献18

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部