摘要
随着国家电网通信网络等相关产业大规模提高线路等级建设标准,给三电迁改的工作协调、成本管理等带来了巨大的压力和困难。以中兰铁路客专甘肃段三电迁改案例为例进行分析。
With the large-scale improvement of the line grade construction standards in the related industries such as the state grid communication network,great pressure and difficulties have been brought to the coordination of the work and the cost management of the three power transformation.In this paper,the case of Gansu section of Zhongwei-Lanzhou railway is analyzed.
作者
李铁
LI Tie(th Engineering Co.,Ltd of CRCC Bridge Engineering Bureau Group,Sichuan 610500,China)
出处
《集成电路应用》
2020年第7期144-145,共2页
Application of IC
关键词
电气化工程
中兰铁路
三电迁改
工程实施
案例分析
electrification project
Zhongwei-Lanzhou railway
three power transformation
project implementation
case analysis