大跨度连续梁下滑道墩顶转体技术研究 被引量:2

Research on the Construction Technology of Turning the Pier Top of the Sliding Path of Large-span Continuous Beam
下载PDF
导出
摘要 在既有线施工过程中,为保证既有线运营安全,减少对其运营干扰和增加施工效率及施工速度,大跨连续梁施工采用支架旁位现浇、下滑道牵引体系和墩顶转体相结合的施工方法.新建京雄铁路固安特大桥(72+ 128+72)m连续梁是全路首例创新采用“下滑道墩顶转体”技术,且是高速铁路最大跨度墩顶转体连续梁,结合该转体施工的成功经验,简述连续梁墩顶转体结构、下滑道牵引体系在施工转体过程中解决的技术问题,为今后类似跨既有线桥梁转体施工提供一定依据. In order to ensure the operation safety of the existing line during construction,reduce the interference to its operation and increase the construction efficiency and speed,the large-span continuous beam construction is carried out by combining the support side cast-in-place,the sliding path traction system and the pier top rotation.The(72+128+72)m continuous beam of the newly-built Gu'an Super-large Bridge of Beijing-Xiong'an Intercity Railway is the first case of innovative application of the technology of“sliding path pier top turning”,and also the continuous beam of the largest span pier top turming of high-speed railway.In combination with the successful experience of the turming construction,this paper briefly introduced the technical problems of continuous beam pier top turming structure and sliding path traction system in the process of pier top turning,thus providing certain criteria for similar bridge turning across the existing line in the future.
作者 高峰 GAO Feng(China Railway 19th Bureau Group Co.Ltd.,Beijing 100176,China)
出处 《铁道建筑技术》 2020年第7期60-63,共4页 Railway Construction Technology
基金 中铁十九局集团有限公司科技研究开发课题(19-A0I)。
关键词 下滑道牵引系统 墩顶转体 转体施工 sliding path traction system pier top turning swivel construction
  • 相关文献

参考文献12

二级参考文献53

共引文献127

同被引文献24

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部