摘要
火神山医院项目涵盖专业系统多,分包施工单位多,现场施工人员密集,短时间内须完成所有施工任务,并达到传染病医院的使用功能要求,给施工带来极大挑战。在此情况下需制定高效的多专业协调管理措施,主要从技术环节、施工环节进行高效协同。项目前期,明确多专业协调管理思路,确定协调管理机制,施工过程中严格落实多专业协调管理思路,提高施工效率,保证医院按期交付使用。
The project of Huoshenshan Hospital covers multi-professional systems, there are many subcontracted construction units and intensive on-site construction personnel,and in a short time to complete all construction tasks,the use function of infectious disease hospitals is achieved, great challenge to construction is brought. In this case,it is necessary to formulate effective management measures for multi-professional coordination, mainly from the technical link, construction link for efficient coordination,in the early stage of the project,the idea of multi-professional coordination and management should be clarified,coordination and management mechanisms is identified,the idea of multi-professional coordination and management is strictly implemented,the construction efficiency is improved,the hospital to be delivered and used on schedule is ensured.
作者
李海兵
黄烨
张洪波
倪朋刚
陈学军
LI Haibing;HUANG Ye;ZHANG Hongbo;NI Penggang;CHEN Xuejun(General Construction Co.of CCTEB Group Co,Ltd,Wuhan,Hubei 430064,China)
出处
《施工技术》
CAS
2020年第12期30-32,共3页
Construction Technology
基金
中建三局2020年度科技研发课题(CSCEC3B-2020-28):应急呼吸道传染病医院快速建造技术与总承包管理。
关键词
医院
多专业
机电
管理
效率
hospitals
multi-professional
mechanical and electrical
management
efficiency