摘要
武汉雷神山医院项目对周边道路采取分级管制,道路通行、物流人流线分别规划的方法,实现交通组织有序化、规范化。结合工程建设周期内存在的交通差异和仓储特点,模拟分施工阶段、分工作时段、分高低峰、内外场交叉等多种情况,分别采取针对性措施进行穿插转换,最终最大化道路运输使用率,为应急工程高效建设提供强力保障。
Wuhan Leishenshan Hospital realizes the orderly and standardized traffic organization by adopting the method of planning the surrounding road grading control,road access and logistics line and people line planning respectively. In addition, combined with the traffic differences and storage characteristics existing in the construction cycle,various situations such as construction stage,working period,high and low peaks,interpenetration and conversion between internal and external fields are simulated,and targeted measures are taken to carry out interpenetration and conversion,finally,it maximizes the utilization rate of road transportation and provides a strong guarantee for the efficient construction.
作者
余云冲
刘诗瑶
詹沁霖
张志刚
方仪
YU Yunchong;LIU Shiyao;ZHAN Qinlin;ZHANG Zhigang;FANG Yi(China Construction Third Bureau First Engineering Co.,Ld,Wuhan,Hubei 430040,China)
出处
《施工技术》
CAS
2020年第12期49-53,共5页
Construction Technology
基金
中建三局2020年度科技研发课题(CSCEC3B-2020-28):应急呼吸道传染病医院快速建造技术与总承包管理。
关键词
医院
应急工程
快速建造
交通管理
仓储
hospitals
emergency engineering
rapid build
traffic management
warehouse