超短工期装配式钢结构EPC项目管理实践——以甘南文旅会展中心项目为例 被引量:5

Management Practice of Assembly Steel Structure EPC Project with Ultra Short Time Limit:Taking Gannan Cultural and Tourism Exhibition Center as an Example
下载PDF
导出
摘要 针对具有96天超短工期、体量大、自然气候条件恶劣等特点的甘南文旅会展中心项目,分析工程的难点与特点,然后从工程设计、物资采购、施工管理等方面阐述EPC项目的管理,最后从设计施工、全要素管理、风险防范等角度介绍本项目的实施经验。 For Gannan culture and tourism exhibition center project with 96 days of ultra short construction period,large volume and bad natural climate conditions,this paper analyzes the difficulties and characteristics of the project.Then expounds the EPC project management from engineering design,material procurement and construction management.Finally introduces the practice experience of the project from design-construction,total factor management and risk prevention.
作者 闫汝刚 YAN Rugang(Gansu Seventh Construction Group Co.,Ltd,Lanzhou 730000,China)
出处 《建筑经济》 北大核心 2020年第8期83-85,共3页 Construction Economy
关键词 超短工期 装配式 EPC 采购策划 ultra short time limit assembly EPC procurement planning
  • 相关文献

参考文献4

二级参考文献11

共引文献21

同被引文献23

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部