期刊文献+

某尾矿库调洪计算

Flood Regulartion Calculation of Tailings Pond
下载PDF
导出
摘要 调洪计算在尾矿库设计和运行管理中都是非常重要的,水量平衡是常用计算方法,涉及较多的插值计算与试算。为了提高计算效率和计算质量,在利用Excel强大数据处理功能的同时,采用VBA编程方法实现计算过程自动化。降低了人工插值和试算对计算结果的影响,提高了工作效率。计算过程清晰,通用性强。 Flood regulartion calculation is very important in the design and operation management of tailings pond,and water balance is regarded as a common calculation method which involves many interpolation calculations and trial calculations.In order to improve the computational efficiency and quality,by using Excel's powerful data processing capabilities and VBA programming method,it can achieve the calculation process automatically.It's the way to reduce the influence of labor in interpolation and trial calculations and improve the work efficiency.Moreover,the calculation process is clear and versatile.
作者 苏伟强 Su Weiqiang(Sichuan Xiye Engineering Design Consulting Co.,Ltd.)
出处 《现代矿业》 CAS 2020年第7期88-91,共4页 Modern Mining
关键词 尾矿库 调洪计算 水量平衡 VBA编程 Tailings pond Flood regulation calculation Water balance VBA programming
  • 相关文献

参考文献6

二级参考文献30

共引文献203

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部