浅谈湿陷性黄土高填方路基质量控制与殊路基处理施工方案

Talking about the Quality Control of Collapsible Loess High Fill Roadbed and the Special Roadbed Treatment Construction Scheme
下载PDF
导出
摘要 在进行湿陷性黄土高填方路基和殊路基的施工操作时,容易因为受所处区域的土层和地质因素影响,发生沉陷现象,进而影响施工进度和整体质量。基于此,需采取有效的质量管控措施,改善区域土层和地质缺陷,保证施工的有序进行。本文结合具体施工案例,对湿陷性黄土区域的高填方和殊路基工程质量管控处理加以分析,以期为类似工程提供借鉴。 During the construction of collapsible loess high-fill subgrade and special subgrade,it is easy to cause subsidence due to the influence of the soil layer and geological factors in the area,which will affect the construction schedule and overall quality.Based on this,effective quality control measures need to be taken to improve regional soil layers and geological defects to ensure the orderly construction.This article combines specific construction cases to analyze the quality control of high fill and special subgrade projects in collapsible loess areas,with a view to providing reference for similar projects.
作者 原飞飞 YUAN Feifei(China Railway 12th Bureau Group Third Engineering Co.,Ltd.,Taiyuan Shanxi 030024)
出处 《智能建筑与工程机械》 2020年第3期1-3,共3页 Intelligent Building and Construction Machinery
关键词 高填方路基 殊路基 质量控制 施工方案 湿陷性黄土 high fill roadbed special roadbed quality control construction scheme collapsible loess
  • 相关文献

参考文献2

二级参考文献6

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部