摘要 在资源受限项目调度问题中,将可更新资源进一步拓展为具有胜任力差异的人力资源,建立考虑胜任力差异的人力资源受限多目标项目调度问题模型.该模型是对传统多模式资源约束项目调度问题更接近研发项目群实际的扩展.针对模型提出两阶段优化算法,第1阶段是项目时序约束优化阶段,采用蚁群算法(ACO)进行任务列表的优化求解,通过对信息素增量规则的改进、串联进度生成机制(SSGS)及资源冲突消解策略的使用,使蚁群算法的求解效率和质量得以提高;第2阶段是资源约束优化阶段,以第1阶段求得的优化任务列表为输入,逐项对人力资源约束进行核查与调整,最终生成项目调度的优化方案.数值实验表明,考虑胜任力差异的数学优化模型更符合研发项目群管理实践,同时两阶段算法在求解质量方面具有良好性能. In resource-constrained project scheduling problem,renewable resource can be expanded into human resource with competency di?erences,and a flexible resource-constrained project scheduling problem with competency di?erence is proposed,which is a practical extension close to research and development(R&D)program from the traditional multi-mode resource-constrained project scheduling problem.In order to address the problem,a two-stage algorithm is proposed.In the first stage of precedence constraints satisfactory optimization,a revised ant colony optimization(ACO)algorithm is presented to obtain the feasible activity sequence.In order to accelerate the convergence e?ciency and quality,a revised pheromone increment updating operator of ACO with the combination of the serial schedule generation scheme(SSGS)and the resource conflict resolution strategy are used.At the second stage of resource-constraints satisfactory optimization,the obtained optimum precedence activity sequence is taken as the input,and the resource capacity is examined and adjusted one by one until the optimal scheduling solution is obtained.Experimental results show that the optimization model considering the di?erence of competency is more suitable for the R&D program management practice,and two-stage algorithm can solve the model e?ectively.
作者 陈俊杰 同淑荣 叶正梗 张静文 王曜 聂亚菲 张雨芊 CHEN Jun-jie;TONG Shu-rong;YE Zheng-geng;ZHANG Jing-wen;WANG Yao;NIE Ya-fei;ZHANG Yu-qian(School of Management,Northwestern Polytechnical University,Xián 710072,China;School of Mechanical Engineering,Northwestern Polytechnical University,Xián 710072,China;School of Management,Sun yat-Sen University,Guangzhou 510275,China)
出处 《控制与决策》 EI CSCD 北大核心 2020年第8期2013-2020,共8页 Control and Decision
基金 国家自然科学基金项目(71572148) 航空科学基金项目(2015ZG53080) 中国博士后科学基金项目(2015M580875)。
关键词 胜任力 研发项目群 项目调度 蚁群算法 串行调度生成机制 冲突消解 competence R&D program project scheduling ant colony optimization serial schedule generation scheme conflict resolution
  • 相关文献

参考文献6

二级参考文献82

  • 1Lamiri M, Xie X L, Dolgui A, et al. A stochastic model for operating room planning with elective and emergency demand for surgery[J]. European Journal of Operational Research, 2008, 185:1026 1037.
  • 2Blake J T, Dexter F, Donald J. Operating room managers' use of integer programming for assigning block time to surgical groups: A case study[J]. Anesth Analg, 2002, 94(1): 143-148.
  • 3Jebalia A, Hadj Alouane A B, Ladeta P. Operating rooms scheduling[J]. Int J Production Economics, 2006, 99: 52 62.
  • 4Cardoena B, Demeulemeestera F, Beliena J. Sequencing surgical cases in a day-care environment: An exact branch-and-price approach[J]. Computers gg Operations Research, 2009, 36:2660 2669.
  • 5Pham D N, Klinkert A. Surgical case scheduling as a generalized job shop scheduling problem[J]. European Journal of Operational Research, 2008, 185: 1011-1025.
  • 6Lamiri M, Xie X L, Dolgui A, et al. A stochastic model for operating room planning with elective and emergency demand for surgery[J]. European Journal of Operational Research, 2008, 185: 1026-1037.
  • 7Ozkarahan I. Allocation of surgeries to operating rooms by goal programing[J]. Journal of Medical Systems, 2000, 24(6): 339-378.
  • 8Bellenguez O, N6ron E. A branch-and-bound method for solving multi-skill project scheduling problem [ J ]. RAIRO- Operations Research ,2007,41 (2) : 155 - 170.
  • 9Heimerl C, Kolisch R. Work assignment to and qualification of multi-skilled human resources under knowledge depreciation and company skill level targets [ J ]. International Journal of Production Research ,2010,48 ( 13 ) :3759 - 3781.
  • 10Li H, Womer K. Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm [ J ]. Journal of Scheduling, 2009, 12 ( 3 ) : 281 - 298.