建设单位投资控制管理研究 被引量:2

Research on the Investment Control Management of Construction Unit
下载PDF
导出
摘要 剖析建设单位各阶段投资控制重点难点,譬如投资决策阶段投资测算不准确、工程设计阶段设计文件不完善、工程招标阶段清单漏项等。然后提出针对各阶段投资控制重点难点主要干系人的管理策略,以期保证建设单位对于整体工程投资控制的合理性。 This paper analyzes the key and difficult points of the investment control in each stage of the construction unit,such as the inaccurate investment calculation in the investment decision-making stage,the imperfect design documents in the engineering design stage,the missing items in the list in the engineering bidding stage,etc.Then,puts forward the management strategies for the key and difficult stakeholders in each stage of investment control,in order to ensure the rationality of the construction unit for the overall project investment control.
作者 田智中 TIAN Zhizhong(Beijing Engineering Consulting Company,Beijing 100124,China)
出处 《工程经济》 2020年第6期5-7,共3页 ENGINEERING ECONOMY
关键词 建设单位 投资控制 投资管理 阶段划分 construction unit investment control investment management stage division
  • 相关文献

同被引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部