摘要
应用英国Wallingford公司的InfoWorks软件中的ICM模块,根据武汉市黄陂区前川地区新的排涝标准和要求,对什仔湖闸的规模进行了论证,并就闸址的选择、节制闸的选型以及节制闸结构、建筑、电气等配套工程做出了相应的技术方案设计.
Based on the ICM module in InfoWorks software of Wallingford Company of UK, and according to the new drainage standards and requirements in Qianchuan Area of Huangpi District, Wuhan City, the scale of Shizai Lake sluice is demonstrated, and the corresponding technical scheme design is made for the selection of the sluice site, the selection of the control sluice, and the supporting projects such as the control sluice structure, buildings and electricity.
作者
於斯
鞠天琛
李晓军
梁传浩
YU Si;JU Tian-chen;LI Xiao-jun;LIANG Chuan-hao(China Construction Third Bureau Engineering Design Co.Ltd.,Wuhan 430064,China)
出处
《工程建设与设计》
2020年第17期74-76,共3页
Construction & Design for Engineering