建设征地移民安置项目管理分析 被引量:1

Management Analysis of Resettlement Project of Land Acquisition for Construction
下载PDF
导出
摘要 征地移民安置是工程建设的重要环节和关键步骤,其安置规划设计的合理化程度直接关系着征地居民搬迁和地区稳定工作能否有效地开展,一旦规划失当,极易引发民怨民愤,激发征地移民和政府或开发商之间的矛盾,影响工程项目的安全、质量和进度管理.为了更好地开展建设征地移民安置规划设计工作,应结合征地移民安置的特点和内容,引入项目管理的方法和手段,调和项目开发征地与移民安置的潜在矛盾,提高对工程的安全、质量和进度管理. Resettlement of land acquisition is an important link and key step in engineering construction.The rationalization of resettlement planning and design is directly related to the effective implementation of relocation of land requisitioned residents and regional stability.Once the planning is improper,it is easy to arouse public resentment and resentment,stimulate conflicts between land requisitioned immigrants and the government or developers,and affect the safety,quality and schedule management of engineering projects.In order to better carry out the planning and design of resettlement for land acquisition for construction,methods and means of project management should be introduced in combination with the characteristics and contents of resettlement for land acquisition to reconcile the potential contradictions between land requisition and resettlement for project development and improve the safety,quality and schedule management of the project.
作者 冯雪 FENG Xue(Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
出处 《工程建设与设计》 2020年第17期219-220,226,共3页 Construction & Design for Engineering
关键词 建设征地 移民安置 项目管理 land acquisition for construction resettlement project management
  • 相关文献

参考文献3

共引文献13

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部