摘要 北京新机场线草桥站站后折返线大断面暗挖隧道工程下穿京沪铁路,由于下穿区域为砂卵石地层且京沪铁路对路轨控制标准要求较高,因此采用MADIS/GTS有限元软件对北京新机场线大断面暗挖隧道下穿京沪铁路的施工方案进行有限元分析。模拟计算结果表明,暗挖下穿施工对土层及轨道的影响在控制标准之内。北京地区相关暗挖施工工程的监测数据验证了所采用的有限元分析模型的可靠性。 The large-section tunnel excavation project of Caoqiao Station turn back line on Beijing New Airport Line crosses under Beijing-Shanghai Railway.Because the underpass area consists of sandy pebble stratum,Beijing-Shanghai Railway line has higher requirements for rail control standards,MADIS/GTS finite element software is adopted to conduct finite element analysis on the construction scheme of the large-section tunnel excavation.The simulation calculation results show that the impact of the tunnel construction on the stratum and the track is within the control standard.The monitoring data for relevant mining constructions in Beijing have verified the reliability of the finite element analysis model adopted in this paper.
作者 刘胜欢 杜明芳 易领兵 吕高乐 李帅兵 李艺博 王硕 王强 LIU Shenghuan;DU Mingfang;YI Lingbing;LYU Gaole;LI Shuaibing;LI Yibo;WANG Shuo;WANG Qiang(College of Civil Engineering,Henan University of Technology,450001,Zhengzhou,China;不详)
出处 《城市轨道交通研究》 北大核心 2020年第8期125-129,共5页 Urban Mass Transit
关键词 北京新机场线 京沪铁路 大断面暗挖隧道 下穿施工 Beijing New Airport Line Beijing-Shanghai Railway large-section tunnel excavation under crossing construction
  • 相关文献

参考文献3

二级参考文献27

共引文献22

同被引文献99

引证文献11

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部