摘要
本文介绍了西铭矿在西山煤田2~#煤层中推广应用"110工法"开采技术时,在原有"顶板深孔定向爆破切顶卸压+巷道补强支护"的基础上,采用"高水材料巷旁充填+顶板深孔定向爆破切顶卸压相结合的沿空留巷+充填墙插管抽采与预注氮+将充填工艺纳入采煤正规循环作业程序"等技术革新,解决了"110工法"潜在的安全隐患,为其在西山煤田2~#煤层中推广应用提供了安全保障。
This article introduces the promotion and application of "110 construction method" mining technology in Xishan Coalfield No.2 coal seam in Ximing Mine. On the basis of the original "roof deep-hole directional blasting roofcutting and pressure-relief + roadway reinforcement support", the potential safety hazard of "110 construction method" has been solved by adopting the technical innovation of "high water content material for roadside packing + roof deephole directional blasting roof-cutting and pressure-relief combined with gob side entry retaining + filling wall intubation extraction and pre-nitrogen injection + bringing filling process into the regular cycle operation procedure of coal mining", which has provided safety guarantee for its popularization and application in the No.2 coal seam of Xishan Coalfield.
作者
赵文曙
梁旺亮
刘晓春
王亚敏
Zhao Wenshu;Liang Wangliang;Liu Xiaochun;Wang Yamin(Ximing Coal Mine of Shanxi Xishan Coal Electricity Group Co.,Ltd.,Taiyuan Shanxi 030052,China)
出处
《同煤科技》
2020年第4期37-39,共3页
Datong Coal Science & Technology
关键词
无煤柱开采
切顶卸压
巷旁充填
瓦斯抽采
注氮
Pillarless mining
Pressure relief by roof cutting
Roadside packing
Gas drainage
Nitrogen injection