摘要 针对某6 kV磨煤机在运行过程中正常启动且电流返回正常,紧接着BC相两次电流突变后电机三相短路速断保护动作开关跳闸事件,首先通过分析该磨煤机保护动作时序记录、保护动作相关曲线,初步判断故障原因为磨煤机电机内部短路;接着对磨煤机电机内部进行解体检查,确认雨水或雨停后的滴水从已锈蚀穿孔的电机冷却器顶板进入电机内部是电机运行中短路的直接原因;最后提出相应的防范措施。 A 6 kV coal pulverizer started normally and the current returned to normal during operation, and then the motor three-phase short-circuit quick break protection action switch tripped after two current mutations of phase BC. In view of this accident, first of all, by analyzing the protective action time sequence record and protective action related curve of the pulverizer, it was preliminarily determined that the fault was caused by the short circuit inside the pulverizer motor. Then, the inside of pulverizer motor was disassemble and inspected, and the direct cause of the short circuit in the motor operation was confirmed that the rain water or the dripping water after the rain stopped entered into the motor from the top plate of the rusted and perforated motor cooler. Finally, corresponding preventive measures were proposed.
作者 吴昱燕 WU Yuyan(Zhanjiang Zhongyue Energy Co.,Ltd.,Zhanjiang 524000,China)
出处 《电工技术》 2020年第14期53-54,共2页 Electric Engineering
关键词 磨煤机 三相短路 过流保护 电流速断保护 电机内部积水 pulverizer three-phase short circuit overcurrent protection current break protection internal water accumulation of motor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部