期刊文献+

高山风电场雷击分析与接地整改防护 被引量:4

Lightning Strike Analysis and Ground Rectification Protection in Alpine Wind Farm
下载PDF
导出
摘要 通过阐述雷电损坏机理、建立雷电放电模型、评估风电场接地网状况,在综合研究风电场接地网条件、雷电对风机和箱式变电站过电压损坏过程、等电位连接系统的基础上,对风电场遭受雷击造成设备损坏的事故开展深入分析,获得整治方案,并重点介绍实施接地网改造和等电位连接等整改措施以及更换低压侧电涌保护器等抑制防护措施。 By expounding the mechanism of lightning damage,establishing the lightning discharge model and evaluating the grounding grid condition of wind farm,on the basis of a comprehensive study of the grounding grid conditions of wind farms,the process of over-voltage damage caused by lightning to wind turbines and box-type substations and the equipotential connection system,an in-depth analysis is carried out on the accidents of equipment damage caused by lightning strikes in wind farms.The improvement measures,such as the improvement of grounding grid and equipotential connection,and the replacement of low-voltage side surge protector are introduced.
作者 范昭胜 FAN Zhaosheng(Hunan Water Resources Development Investment Co.,LTD.,Changsha 410007,China)
出处 《湖南电力》 2020年第4期63-67,共5页 Hunan Electric Power
关键词 高山风电 雷击过电压 接地网改造 等电位 低压侧电涌保护器 alpine wind power lightning overvoltage reconstruction of grounding network equipotential low pressure side surge protector
  • 相关文献

参考文献8

二级参考文献48

  • 1孔纲,卢锦堂,车淳山,许乔瑜.热镀锌钢白锈产生原因分析及预防[J].腐蚀与防护,2005,26(10):450-452. 被引量:23
  • 2孟庆波,何金良.降低接地装置接地电阻的新方法[J].高电压技术,1996,22(2):67-68. 被引量:31
  • 3曾嵘,何金良,张波,庄池杰.电力系统接地技术研究新进展[J].陕西电力,2007,35(2):1-5. 被引量:14
  • 4卡兰塔罗夫пл 等 陈汤铭译.电感计算手册[M].北京:机械工业出版社,1992..
  • 5.电力电缆手册(第二版)[M].北京:机械工业出版社,2001..
  • 6.DL/T621-1997.交流电气装置的接地[S].,1997..
  • 7DL/T621-1997中华人民共和国电力行业标准.交流电气装置的接地[S].北京:中华人民共和国电力工业部,1998.
  • 8DL/T620-1997中华人民共和国电力行业标准.交流电气装置的过电压保护和绝缘配合[S].北京:中华人民共和国电力工业部,1997.
  • 9Gamesa Eolica. Description of windturbine[M]. Spain Gemesa: Gamesa Eolica, 2003.
  • 10刘继.风力发电装置的雷电防护与电磁兼容问题[C]∥第三届中国防雷论坛论文摘编.深圳:中国防雷信息网,2004.

共引文献67

同被引文献27

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部