浅谈长洲水利枢纽机组轴瓦的保护措施 被引量:1

Protection Measures for Bearing Pad of Units in Changzhou Hydro Project
下载PDF
导出
摘要 为防止在机组运行过程中轴瓦烧损事故的发生,避免造成重大损失,针对造成轴瓦损伤的可能原因,在机组投产时及投产后,采取了增加供油流量开关等多种轴瓦保护措施,提高了机组在运行过程中轴瓦的可靠性,从而确保了机组安全运行。通过实践证明,保护措施的实施取得了良好的效果,也为解决类似的问题提供了很好的借鉴。 In order to prevent the occurrence of bearing pad burning accident during the operation of the unit and avoid causing heavy losses,in view of the possible causes of bearing pad damage,during and after the unit is put into operation,a variety of bearing pad protection measures such as adding oil supply flow switch are adopted to improve the reliability of bearing pad during the operation of the unit,so as to ensure the safe operation of the unit.Through practice,it has achieved good results and provided a good reference for solving similar problems.
作者 蔡斌 CAI Bin(SPIC Guangxi Changzhou Hydropower Development Co.,Ltd.,Wuzhou,Guangxi,543002)
出处 《红水河》 2020年第4期104-106,共3页 Hongshui River
关键词 轴瓦 机组 损伤 保护措施 长洲水利枢纽 bearing pad unit damage protection measure Changzhou hydro project
  • 相关文献

参考文献1

二级参考文献2

  • 1《超声波探伤》编写组.超声波探伤[M]北京:水利电力出版社,1985.
  • 2崔忠圻.金属学及热处理[M]北京:机械工业出版社,2004.

同被引文献15

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部