摘要
乌江渡发电厂3号机组在开机过程中曾发生机组制动风闸下落后上腔不排气现象,导致自动开机流程不能继续执行,文章针对该厂出现的此种现象的原因进行分析论证,并采取相应处理措施,以提高机组开机成功率。
During the starting up process of unit 3 in Wujiangdu Power Plant,there was a phenomenon that the upper chamber did not exhaust after the braking air brake of the unit fell down,resulting in the failure of automatic starting up process.This paper analyzes and demonstrates the causes of this phenomenon in the power plant,and takes corresponding measures to improve the success rate of unit starting up.
作者
郑攀登
吴恒
ZHENG Pandeng;WU Heng(Wujiangdu Power Plant of Guizhou Wujiang Hydropower Development Co.,Ltd.,Zunyi,Guizhou,563104;The 4th Construction Company Ltd.of China 15th Corperation,Zhengzhou,Henan,450000)
出处
《红水河》
2020年第4期107-110,共4页
Hongshui River
关键词
风闸
开机流程
上腔
机组
乌江渡发电厂
air brake
starting up process
upper chamber
unit
Wujiangdu Power Plant