摘要
新建宁波穿山港铁路穿山港站至中宅站为单线区间,穿山港站与中宅站之间采用调车方式办理进路。以穿山港站和中宅站为例,探讨了两车站间不采用基本闭塞方法办理进路时,可采用的信号设计方案。最后,结合穿山港站与中宅站的实际情况,选定了采用的信号设计方案。
The section between Chuanshangang Station and Zhongzhai Station in the newNingbo-Chuanshangang Railway is the single-linesection,the shunting mode is adopted to handle the route between Chuanshangang station and Zhongzhai station.Taking Chuanshangang station and Zhongzhai station as an example,this paper discusses the signal design scheme that can be adopted when the route is handled according to the shunting mode between the two stations,and finally selects the signal design scheme based on the actual situation of Chuanshangang station and Zhongzhai station.
作者
和贵恒
HE Guiheng(China Railway SIYUAN Survey And Design Group Co.,Ltd.,Wuhan 430063)
出处
《铁道勘测与设计》
2020年第3期70-71,78,共3页
Railway Survey and Design