期刊文献+

影响矿山巷道快速掘进因素研究 被引量:4

Research on Factors Affecting Rapid Tunneling in Mine Roadway
下载PDF
导出
摘要 矿山企业为保证开采效率,往往对巷道掘进效率提出较高要求,而受复杂矿山地质条件、掘进设备工艺以及掘进施工管理水平等因素限制,严重阻碍掘进效率的提升。本文着重分析矿山巷道掘进的影响因素,并在此基础上探讨了快速掘进保障措施,旨在提高矿山生产效率。 In order to ensure the mining efficiency,mining enterprises often put forward higher requirements for the tunneling efficiency.However,due to the restrictions of complex mine geological conditions,tunneling equipment technology and tunneling construction management level,the improvement of tunneling efficiency is seriously hindered.This paper focuses on the analysis of the influencing factors of mine roadway excavation,and on this basis discusses the guarantee measures for rapid excavation,aiming at improving the mine production efficiency.
作者 李红斌 Li Hongbin(No.1 Mine of Yangquan Coal(Group)Co.,Ltd.,Shanxi,045008)
出处 《当代化工研究》 2020年第16期87-88,共2页 Modern Chemical Research
关键词 矿山巷道 快速掘进 影响因素 mine tunnel rapid excavation influence factor
  • 相关文献

参考文献14

二级参考文献46

共引文献50

同被引文献17

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部