摘要
随着现代化建设的发展,多个地区的老机房需要拆除及搬迁,如何高效顺利搬迁至新机房成为关键。以富阳华数文化中心前端机房搬迁为例,阐述了动力保障、信号保障、传输保障、环境保障、网络管理等5个方面的详细方案。
With the development of China's modernization,old machine rooms in many areas are facing demolition and relocation.How to move to the new machine room efficiently and smoothly becomes the key.Taking the relocation of Fuyang Wasu cultural center hub head-end machine room as an example,this article expounds the detailed scheme in five aspects:power guarantee,signal guarantee,transmission guarantee,environment guarantee and network management.
作者
卢良军
LU Liangjun(Hangzhou Fuyang Wasu Digital TV Co., Ltd, Fuyang 311400,China)
出处
《中国有线电视》
2020年第8期914-916,共3页
China Digital Cable TV
关键词
动力保障
信号保障
传输保障
环境保障
网络管理
power guarantee
signal guarantee
transmission guarantee
environment guarantee
network management