该文以威远县红炉井煤矿试生产工程实践为例,简述了煤矿试生产工程、联合试运转的主要内容和系统测试的项目、范围、方法和应达到的目标效果,为矿井扩能改造、联合试运转及竣工验收工作的准备具有较强的借鉴作用。
This article takes the trial production project practice of the Honglujing coal mine in Weiyuan County as an example,briefly describes the main content of the coal mine trial production project and joint trial operation,and the project,scope,method and target effect of the system test,which has a strong reference effect on the preparation for mine expansion and reconstruction,joint trial operation and completion acceptance work.
作者
丁华君
叶学辉
曾文忠
DING Hua-jun;YE Xue-hui;ZENG Wen-zhong(Weiyuan County Honglujing Coal Mine,Neijiang 612450,China)
出处
《价值工程》
2020年第25期160-161,共2页
Value Engineering
关键词
煤矿试生产
联合试运转
系统测试
coal mine trial production
joint trial operation
system test