亚投行项目核心筒钢板剪力墙同步吊装、延迟焊接技术 被引量:1

SYNCHRONIZED LIFTING AND DELAYED WELDING TECHNIQUES FOR CORE TUBE STEEL PLATE SHEAR WALL OF AIIB
下载PDF
导出
摘要 高层建筑钢板剪力墙吊装、焊接工程在目前建筑行业中不仅是一项新课题,也是一项难题,亚投行项目是国内首次同一建筑所有核心筒结构竖向全部采用全焊接纯钢板剪力墙施工技术,通过对核心筒钢板剪力墙深化设计、采用同步吊装、延迟焊接技术有效减小了焊接变形,避免了焊接裂缝出现,解决了加工、安装、焊接过程中的施工技术难点,为类似工程施工提供了借鉴。 For the moment,steel plate shear wall lifting and welding of high-rise building are new problems in construction industry,bringing us a new topic to study.The AIIB project is the first domestic project where fully-welded steel plate shear wall construction technique was adopted longitudinally in the same building.In-depth design of core tube steel plate shear wall,synchronized lifting and delayed welding techniques were adopted to effectively reduce the welding deformation,avoid weld crack and solve the technical difficulties in processing,installation and welding,providing references for similar projects.
作者 王华军 迂长伟 刘强 张海涛 林小莉 WANG Hua-jun;YU Chang-wei;LIU Qiang;ZHANG Hai-tao;LIN Xiao-li(General Contracting Department of Beijing Construction Engineering Group,100055,Beijing,China)
出处 《建筑技术》 2020年第8期1013-1015,共3页 Architecture Technology
关键词 钢板剪力墙 深化设计 同步吊装 延迟焊接 steel plate shear wall in-depth design synchronized lifting delayed welding
  • 相关文献

参考文献1

二级参考文献1

共引文献21

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部