摘要
近年来,现代有轨电车作为一种新型城市轨道交通方式,一般敷设在市政道路路中或路侧,与地铁、轻轨、高铁设计还是有差别。基于此,在现有路基设计的理论基础上结合成都有轨电车项目工程情况,对现代有轨电车的路基标准横断面、工后沉降、过渡段、排水设计、道路搭接等技术要点进行了探讨与总结,可为今后类似工程设计提供参考。
In recent years,modern trams,as a new type of urban rail transit,are generally laid on municipal roads or roadsides,and are different from subway,light rail and high-speed rail.Based on this,the existing roadbed design based on the theory of combining chengdu trams project engineering situation,the subgrade of modern tram standard cross-section,postconstruction settlement lap,transition section and drainage design,road,etc.This paper discusses the main technical points and summary,can be designed to provide the reference for future similar projects.
作者
马伟东
MA Weidong(Shanghai Urban Construction Design&Research Institute(Group)Co.,Ltd,Shanghai 200125,China)
出处
《交通与运输》
2020年第S01期143-145,153,共4页
Traffic & Transportation
关键词
有轨电车
路基
工后沉降
道路搭接
Tram
Subgrade
Post-construction settlement
Road lap