摘要
兖矿集团东滩煤矿3302综放工作面安装期间取消地轨,采用重型柴油单轨吊机车运输,确保了安装期间辅助运输安全,提高了安装施工效率。
During the installation of 3302 fully mechanized top coal caving face in Dongtan Coal Mine of Yankuang Group,the ground rail was cancelled and the heavy diesel monorail crane was used for transportation,which ensured the safety of auxiliary transportation during the installation and improved the installation and construction efficiency.
作者
马登陆
刘成升
Ma Deng-lu;Liu Cheng-sheng(Yanzhou Coal Industry Co.,Ltd.,Dongtan Coal Mine,Shandong Zoucheng 273500)
出处
《山东煤炭科技》
2020年第8期91-93,共3页
Shandong Coal Science and Technology
关键词
煤矿
单轨吊
运输
coal mine
monorail crane
transport