摘要
本文针对煤矿多条强力输送带接力运行用人多、空转时间长的问题,通过对集中控制联动运行的顺序、时间进行优化,提高多条接力输送带运行效率,减少运行故障,达到减人提效、节约能耗的效果。
This paper aims at the problem of multi-strong conveyor belt relay running with many people and long idling time,through optimizing the sequence and time of centralized control linkage operation,the operation efficiency of multirelay conveyor belt is improved,the operation failure is reduced,and the effect of reducing human efficiency and energy consumption is achieved.
作者
陈其晖
Chen Qi-hui(Fujian Yongan Coal Industry Co.,Ltd.,Xianting Coal Mine,Fujian Datian 366102)
出处
《山东煤炭科技》
2020年第8期94-95,共2页
Shandong Coal Science and Technology
关键词
接力皮带
联动控制
运行顺序
relay belt
linkage control
running sequence