摘要 本文通过应力解除法在郭屯煤矿巷道中选取了4个测点,进行原岩应力测试,分析原岩应力分布规律以指导矿井更加安全高效的生产。结果显示:最大主应力为水平应力,方向为119.03°~122.01°;工作面巷道掘进方向与最大水平应力已接近垂直,水平应力对巷道围岩控制和底板破坏深度影响严重。 In this paper,through the stress relief method,four measuring points are selected in Guotun Coal Mine roadway to test the primary rock stress and analyze the stress distribution law of primary rock,so as to guide the safe and efficient production of the mine.The results show that:the maximum principal stress is horizontal stress,the direction is 119.03°to 122.01°;and the heading direction of working face is nearly vertical to the maximum horizontal stress,and the horizontal stress has a serious impact on the surrounding rock control and floor failure depth.
作者 赵艳鹏 牛海连 邵珠娟 Zhao Yan-peng;Niu Hai-lian;Shao Zhu-juan(Heze Coal Power Co.,Ltd.,Linyi Mining Group,Shandong Yuncheng 2740201;Jining Senior Vocational School,Shandong Jining 272001;Linyi Mining Group Co.,Ltd.,Shandong Linyi 276017)
出处 《山东煤炭科技》 2020年第8期155-157,165,共4页 Shandong Coal Science and Technology
关键词 原岩应力 郭屯煤矿 测试与分析 stress of primary rock Guotun Coal Mine testing and analysis
  • 相关文献

参考文献5

二级参考文献42

共引文献108

同被引文献22

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部