摘要 论述了国家会议中心二期工程放样测绘的方案设计与施测案例。对后方交会成果与GPS静态和导线平差的结果进行对比,对施测成果和站点坐标解算精度进行了分析;采用后方交会的方法,对基坑内轴线控制点、细部构件平面位置进行测设。通过分析,其精度远大于极坐标法放样,且能保证各区段轴线精准闭合。该方法保证了后方交会在大跨度基坑工程应用中的可靠性。 This paper discussed the scheme design and case of lofting survey in the Second Phase Project of National Conference Center,compared the results of rear rendezvous with the results of GPS static and traverse adjustment,analyzed the results and the accuracy of site coordinate solution.The method of rear intersection is used to survey and set the inner axis control points of the foundation pit and the plane position of the detailed components.Through analysis,its accuracy is far greater than that of polar coordinate lofting,and it can ensure that the axis of each section is accurately closed.This method demonstrated the reliability of rear rendezvous in the application of large span foundation pit engineering.
作者 周建忠 齐翰 王旨 刘哲伦 ZHOU Jianzhong;QI Han;WANG Baofeng;SU Zhongshuai(BCEG No.3 Construction Engineering Company Limited,Beijing 100044,China)
出处 《北京测绘》 2020年第8期1156-1161,共6页 Beijing Surveying and Mapping
关键词 施工测量 放样 导线 平差 construction survey lofting traverse adjustment
  • 相关文献

参考文献7

二级参考文献20

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部