摘要 针对水布垭水电站运行期地下厂房出现的渗水情况,结合厂房结构、内外防渗设计、泄洪及强降雨检查情况等方面,对渗水原因综合、系统分析,提出相应处理措施,实施后经主汛期强降雨及泄洪检验,厂房渗水问题得到了有效解决。 Excessive water leakage is observed in the underground powerhouse of Shuibuya Hydropower Plant during operation period.Considering the powerhouse structure,internal and external seepage control design,inspection situations during the flood discharge and heavy rainfalls,possible reasons of the water leakage problem are analyzed comprehensively.Treatment measures are then proposed correspondingly.Practical tests of heavy rainfalls and flood discharge in the main flood season show that the leakage problem of the powerhouse is effectively solved.
作者 皮军华 PI Junhua(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, China)
出处 《水电与新能源》 2020年第8期52-57,共6页 Hydropower and New Energy
关键词 水布垭水电站 地下厂房 渗水处理 Shuibuya Hydropower Plant underground powerhouse water leakage treatment
  • 相关文献

参考文献1

二级参考文献1

共引文献7

同被引文献30

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部