摘要
通过对水西关雨水泵站、康乐街雨水泵站和水西关街改造工程中降水与支护措施的阐述,比较说明了先支护后降水和先降水后支护两种施工方法的优点及适用情况。
Based on the introduction of the precipitation and support measures in the reconstruction project of Shuixiguan rainwater pump station,Kangle street rainwater pump station and Shuixiguan street,the advantages and application of the two construction methods of supporting and precipitation first and then support are compared.
作者
田瑛
Tian Ying(Taiyuan Municipal Construction Group Co.,Ltd.,Taiyuan 030002,China)
出处
《山西建筑》
2020年第17期63-65,共3页
Shanxi Architecture
关键词
支护
降水
施工顺序
经济性
support
precipitation
construction sequence
economy