期刊文献+

三亚海棠湾红树林酒店

Sanya Haitang-bay Mangrove Resort
下载PDF
导出
摘要 业主:今典集团地点:海南省三亚市海棠北路58号用地面积:109247平方米总建筑面积:86200平方米(不含地下建筑面积)客房数量:611间(不包括Villa别墅客房)建筑高度:148米概念规划:Atkins(英国)建筑设计:CCDI悉地国际+ZNA(美国)景观/室内/幕墙设计:CCDI悉地国际设计/竣工:2010/2017年尽管这座酒店高耸入云,但是建筑师的设计起点却来自对地形的研究策略。从地形上看,三亚海棠湾区域主要由三类特征鲜明的地貌构成:沙丘,海洋,内湖。沙坝自海岸线向内陆纵深近1公里。受风浪及侵蚀影响,靠近海岸区域具较高的气候敏感性。建筑师却坚持尽可能保留原始的地形特征。 Client:ANTAEUS Group Location:58 Haitang North Road,Haitang District,China Site Area:109,247 m2 Floor Area:86,200 m2 Number of Hotel Rooms:611 Construction Height:148m Conceptual Planning:Atkins(UK)Architectural Design:CCDI+ZNA(USA)Landscape/Interior/Curtain Wall Design:CCDI Design/Completion:2010/2017 This building is the first coastal high-rise art hotel in China.Its contour is like a flying bird,while the undulating texture of guest room balconies echoes the sea far away.The exterior curved surface of building faces the sea,thereby minimizing the impact of wind on structure and maximizing the view width of sea view rooms.
出处 《世界建筑导报》 2020年第4期102-105,共4页 World Architecture Review
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部