浅谈某半潜式钻井平台极地作业改装设计

Polar Operation Modification Design of Semi-submersible Drilling Unit
下载PDF
导出
摘要 相比于普通海域作业,在极地寒冷区域作业对海洋工程装备提出了更高的要求。本文简要介绍了我司承接的某半潜式钻井平台为满足在极地寒冷区域作业要求而进行改装设计。其主要改装内容包括:提升平台吊机的吊运能力;扩容生活区;更换发电机组;增加防寒功能;达到零排放要求等。确保平台在极地寒冷区域能够正常作业,满足相关规定。 Compared with the ordinary sea area operation,the operation in the polar cold area puts forward higher requirements for marine engineering equipment.This paper introduces the modification design of a semisubmersible drilling unit in order to meet the operational requirements of polar cold areas.The main contents of the modification include increasing the lifting capacity of the platform crane,expanding and transforming living area,replacing the generator set,increasing the cold protection function,meeting the zero emission requirements,so as to ensure the normal operation of the platform in the polar cold area and meet the relevant regulations.
作者 徐方雄 XU Fangxiong(Yiu Lian Dockyards(Shekou)Ltd.,Shenzhen 518000)
出处 《广东造船》 2020年第4期23-25,共3页 Guangdong shipbuilding
关键词 半潜式钻井平台 极地作业 改装设计 Semi-submersible drilling unit Polar operation Modification design
  • 相关文献

参考文献3

二级参考文献10

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部