摘要
某型散货船为了实现靠港期间零排放,拟加装高压岸电系统。为优化改造方案,保障改造工作顺利进行,通过电力负荷和短路电流计算,对改造方案进行验证。结合该船改造过程,介绍改造方案及效用试验,并对高压岸电系统的后期运营提出建议。
In order to achieve zero discharge at port,a certain bulk carrier is proposed to install a high voltage shore power system.In order to optimize the installation scheme and ensure the smooth progress of the installation,the installation scheme is verified in the early stage through the calculation of power load and short-circuit current.Combined with the installation process,this paper introduces the installation scheme and the function test,and puts forward further suggestions for the later operation of the high-voltage shore power system.
作者
马兴旺
MA Xingwang(Qinhuangdao Branch of China Classification Society,Qinhuangdao 066002)
出处
《广东造船》
2020年第4期49-52,共4页
Guangdong shipbuilding
关键词
船舶高压岸电系统
耐压试验
对称短路电流
等电位连接
Marine high voltage shore power system
Withstand voltage test
Symmetric short-circuit current
Equipotential connection