摘要
文章从设计者的角度,对高混凝土面板堆石坝河谷中部面板压性破坏问题进行了思考,以期引起同行对此问题的关注和讨论,深化认识并最终形成有效的解决方案。
From the perspective of the design engineer,the author made considerations on the problem of the crushing rupture of the slab in the middle of the valley of the high concrete face rockfill dam to draw the attention of CFRD designers and further discussion of the peers,deepen the understanding and finally find an effective solution.
作者
范建朋
FAN Jianpeng(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China)
出处
《西北水电》
2020年第4期1-3,共3页
Northwest Hydropower
关键词
高面板坝
河谷中部
面板压性破坏
high concrete face rockfill dam
middle part of river valley
crushing rupture of face slabs