2Athanasios E Chassiakos, A.M.ASCE, and Serafim P. Sakellaropoulos. Time-Cost Optimization of Construction Projects with Generalized Activity Constraints[J]. Journal of Construction Engineering and Management, 2005, 13 l : 1115-1124.
3Mohammad A. Ammar. Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows[J]. Journal of Construction Engineering and Management, 2011, 137: 65-71.
4Mohamed Abdel-Raheem and Ahmed Khalafallah. Using Electimize to Solve the Time-Cost-Tradeoff Problem in Construction Engineering[J] . Computing in Civil Engineering, 2011, 137: 250-257.
5Shannon B. TERRY and Gunnar LUCKO. Algorithm for Time-Cost Tradeoff Analysis in Construction Projects by Aggregating Activity-Level Singularity Functions[A]. Construction Research Congress, 2012, 226-236.
6Jide Sun and Lili Wang. The Interaction between BIM's Promotion and Interest Game under Information Asymmetry[J]. Journal of Industrial and Management Optimization, 2015 (4): 1301-1319.