摘要
典型高放射性重金属及其化合物实验室项目,主要为实验开展提供平台,论文介绍了项目建设统筹技术方案等项目管理创新措施,特别关注项目安全分析评价与项目物项分级措施、工作任务分解结构等事项,可资其他放化实验室项目借鉴。
Typical laboratory projects of high-level radioactive heavy metals and their compounds mainly provide a platform for experimental development.This article introduces project management innovation measures such as overall project construction technical plans,with special attention to project safety analysis and evaluation,project item classification measures and work tasks The breakdown structure and other matters can be used for reference in other radiochemical laboratory projects.