期刊文献+

基于GA算法的舰载机快速调度

Aircraft Fast Scheduling Based on GA Algorithm
下载PDF
导出
摘要 为解决舰载机在舰面进行保障时作业顺序、作业时间等多重不确定的问题,设计一种舰载机飞行作业快速调度算法。建立舰载机甲板保障作业组合优化调度模型,对算法结构的编码方式进行阐述,利用合适的遗传算法策略进行求解,给出有效调度方案,在基本静态调度方案上采用动态调度进行调整,得出当前有效快速调度方案,并通过仿真实例对算法的有效性进行验证。仿真结果表明,利用该算法可得到当前算法模式下最优快速调度方案。 In order to solve the multiple uncertain problems such as the operation sequence and operation time of the carrier-based aircraft on the ship’s support,a fast flight scheduling algorithm for carrier-borne aircraft is designed.Aircraft deck to ensure job combination optimization scheduling model is established,the encoding mode of algorithm structure is introduced,the appropriate strategy of genetic algorithm is used to calculate and effective scheduling scheme is given.Based on the basic static scheduling scheme,the current effective fast scheduling schemes is acquired by using dynamic scheduling adjustment,and the effectiveness of the algorithm is validated by simulation examples.The simulation results show that the optimal scheduling scheme can be obtained by using this algorithm.
作者 朱兴动 孟杨凯 黄葵 范加利 Zhu Xingdong;Meng Yangkai;Huang Kui;Fan Jiali(Navy Aviation University,Yantai 264001,China;Brigade of Postgraduate,Qingdao Branch,Navy Aviation University,Qingdao 266041,China)
出处 《兵工自动化》 2020年第9期69-73,共5页 Ordnance Industry Automation
关键词 甲板作业调度 车间调度 启发式规则 遗传算法 deck operation scheduling workshop scheduling heuristic rules genetic algorithm(GA)
  • 相关文献

参考文献9

二级参考文献91

  • 1栾孝丰,谢君.基于仿真优化的多机机务准备流程研究[J].计算机与数字工程,2010,38(12):50-53. 被引量:6
  • 2吴亮红,王耀南,袁小芳,周少武.自适应二次变异差分进化算法[J].控制与决策,2006,21(8):898-902. 被引量:79
  • 3王平,张立,侯玉.基于Agent的航母舰载机出航准备指挥决策系统建模[J].兵工自动化,2007,26(5):33-34. 被引量:4
  • 4余建星,李彦苍.基于蚁群算法的海洋工程群项目资源调度研究[J].系统工程理论与实践,2007,27(7):57-63. 被引量:7
  • 5中国航空工业发展研究中心海军装备部飞机办公室.国外舰载机技术发展:气动、起降、材料、反潜、直升机预警[M].北京:航空工业出版社,2008.
  • 6Waldemar K. Dynamic scheduling state of the art report[R]. SCIS Technical Report T2002:28, 2002.
  • 7Moser I, Hendtlass T. Solving dynamic single-runway aircraft landing problems with extremal optimisation[C]// Proceedings of the 2007 IEEE Symposium on Computa tional Intelligence in Scheduling. 2007:206- 211.
  • 8Malaek S M B, Naderi E. A new scheduling strategy for aircraft landings under dynamic position shifting[C]// Aerospace Conference. 2008 : 1- 8.
  • 9Kouiss K, Pierreval H, Mebarki N. Using multi-agent architecture in FMS for dynamic scheduling[J]. Journal of Intelligent Manufacturing, 1997, 8(1): 41-47.
  • 10Scott J M, Kasin O. Scheduling complex job shops using disjunctive graphs: a cycle elimination procedure[J]. International Journal of Production Research, 2003, 41(5) :981 -994.

共引文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部