摘要 依托兰渝铁路木寨岭隧道工程,对建设过程中大量监控量测数据的统计分析,获得了木寨岭隧道最大水平收敛变形、沉降变形以及挤压大变形的分布规律。基于现场监控量测数据和现场施工过程调查,从有利于应力释放、支护变形可控及降低二衬挤压形变压力的角度,建立了炭质板岩隧道支护位移管理基准和挤压大变形分级标准,这些标准对于炭质板岩等挤压大变形地层中隧道的建设管理具有重要指导意义。最后,基于监控量测得到的初期支护收敛速率与大变形分级标准,开展了炭质板岩隧道二衬施作时机研究,结合工程经验类比,得到了大变形地层二衬施作时机的变形控制基准。这些基准在木寨岭隧道等其他隧道工程中得到了广泛的应用。 Based on the Muzhailing tunnel of the Lanzhou-Chongqing railway,a vast amount of monitoring and measuring data in the process of construction are analyzed statistically,and the maximum extrusion deformation,settlement deformation and the distribution of large deformation were obtained.According to the data of field monitoring measurement and field investigation in the process of construction,the management standard of support displacement and classification standard of large extrusion deformation were established from the perspectives of deformation and stress distribution,which had guiding significance for construction of tunnel in carbonaceous slate strata.Finally,based on the convergence rate of initial support and classification standard of large extrusion deformation,the timing of second lining construction in carbonaceous slate strata was investigated and the standard of deformation control for second lining construction time was obtained.The management standard of support displacement,classification standard of large extrusion deformation and standard of deformation control for second lining construction time had been widely used in Muzhailing tunnel and other tunnel projects in carbonaceous slate strata.
作者 王永刚 丁文其 刘志强 王者超 李崴 Wang Yonggang;Ding Wenqi;Liu Zhiqiang;Wang Zhechao;Li Wei(Gansu Province Transportation Planning,Survey&Design Institute Co.,Ltd.,Lanzhou 730030,P.R.China;College of Civil Engineering,Tongji University,Shanghai 200092,P.R.China;Southwest Research Institute,China Railway Engineering Group Co.,Ltd.,Chengdu 610032,P.R.China;Key Laboratory of Ministry Education on Safe Mining of Deep Metal Mines,Northeastern University,Shenyang 110819,P.R.China)
出处 《地下空间与工程学报》 CSCD 北大核心 2020年第4期1116-1122,共7页 Chinese Journal of Underground Space and Engineering
基金 国家自然科学基金(51779045)。
关键词 炭质板岩 监控量测 挤压大变形 分级标准 二衬支护时机 carbonaceous slate monitoring measurement large extrusion deformation classification standard construction time of second lining
  • 相关文献

参考文献2

二级参考文献21

  • 1刘志春,孙明磊,贾晓云,朱永全.乌鞘岭隧道F4~F7断层区段压力、应力实测与分析[J].石家庄铁道学院学报,2006,19(2):13-17. 被引量:18
  • 2刘志春,李文江,孙明磊,朱永全.乌鞘岭隧道F4断层区段监控量测综合分析[J].岩石力学与工程学报,2006,25(7):1502-1511. 被引量:76
  • 3罗学东,陈建平,范建海,左昌群.火车岭隧道围岩大变形问题及治理[J].煤田地质与勘探,2006,34(4):49-52. 被引量:15
  • 4铁道第一勘察设计院.乌鞘岭隧道岭脊地段复杂应力条件下的变形控制技术研究总报告[R].2006,12.
  • 5刘青松.挤压性软弱围岩隧道大变形控制技术的研究[D].成都:西南交通大学,2004.
  • 6关宝树.隧道力学(下册)[M].成都:西南交通大学出版社,1982.
  • 7铁道第一勘察设计院.乌鞘岭隧道岭脊地段复杂应力条件下的变形控制技术研究阶段成果总报告[R].兰州:铁道第一勘察设计院,2004..
  • 8金鑫 译.陶恩隧道掘进中的一些经验[J].隧道译丛,1976,(2):50-54.
  • 9中华人民共和国行业标准编写组.JTJ042-94公路隧道施工技术规范[S].北京:人民交通出版社,1994.
  • 10中华人民共和国行业标准编写组.TB 10204-2002 铁路隧道施工规范[S].北京:中国铁道出版社,2002.