期刊文献+

昆明市输电所普茨线改造工程异地造林作业设计

Design of Afforestation Operation for PuCi Line Reconstruction Project of Kunming Power Transmission Station
下载PDF
导出
摘要 实地勘查了昆明市输电所普茨线(普吉至茨坝)改造工程,结合实际选择异地造林地块,对该地块作了造林设计,并根据昆明市输电所所处位置特点,提出合理化建议,供异地植被恢复参考。 The transformation project of PuCi Line(Puji to Ciba)of Kunming Power Transmission Station is investigated on the spot.Combined with the actual situation,the afforestation plot is selected,and the afforestation design is made for the plot.According to the location characteristics of Kunming Power Transmission Station,reasonable suggestions are put forward for reference of vegetation restoration in other places.
作者 张群 金钱荣 李金芬 潘仕萍 吴志晖 王晓英 ZHANG Qun;JIN Qianrong;LI Jinfen;PAN Shiping;WU Zhihui;WANG Xiaoying(Dayao County Natural Resources Bureau,Dayao 675400;Yunnan Forest Nature Center,Kunming 650224;Forestry and Prairie Service Center of Guihua Town,Dayao 675409;Forestry and Grassland Service Center of Jinbi town,Dayao 675400)
出处 《林业勘查设计》 2020年第3期34-36,共3页 Forest Investigation Design
关键词 植被恢复 异地造林 输电线路 昆明市 Vegetation Restoration Off-Site Afforestation Transmission Lines Kunming City
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部