摘要
基于BIM技术的三维管综设计在国内已经应用了多年,但由于其关系复杂、布置灵活、跨阶段等原因,不管是设计院还是施工单位,三维管综的相关研究成果较粗浅,缺乏可参照性。本文总结本公司既往项目的 BIM管综设计经验,结合浙江鑫达医院项目的应用案例,着重介绍基于复杂建筑的BIM管综设计标准流程和方法,并对BIM管综设计的思路和经验进行了总结。
BIM-based 3D integrated pipeline design has been implemented in China for many years,but due to those reasons such as complexities,flexibilities and cross-stages,there is few relevant researches to provide enough reference from design and construction companies.This paper has concluded the experience of adopting BIM in integrated pipeline design from our company′s previous projects,integrated with the case of Zhejiang Xinda Hospital Project to highlight the Standard Methods and Procedures(SMP)of integrated pipeline design by using BIM based on complex buildings and to summarize the overall process experience of BIM based integrated pipeline design.
作者
李星亮
谭振峰
刘宇亮
周雯
聂小蒙
李渤
Li Xingliang;Tan Zhenfeng;Liu Yuliang;Zhou Wen;Nie Xiaomeng;Li Bo(Hunan Architectural Design Institute Co.,Ltd.,Changsha 410006,China)
出处
《土木建筑工程信息技术》
2020年第4期104-113,共10页
Journal of Information Technology in Civil Engineering and Architecture
关键词
BIM管综
三维管综
管综流程
管综方法
复杂建筑BIM应用
BIM Integrated Pipeline System
Three-Dimensional Integrated Pipeline System
Integrated Pipeline Process
Integrated Pipeline Method
BIM Application in Complex Building