摘要
早期建设的存量电站受制于当时抢装、组件技术水平和电站设备质量等原因,运行多年后,某些电站发电量损失缺陷和安全隐患逐渐显现出来,对这类电站的技术改造成为一种迫切需求。本文以西北某30 MW光伏电站为例,介绍了该存量光伏电站的技改必要性,提出了技改建设内容的建议,并对技改项目行了财务评价。
The early construction of the photovoltaic power station is subject to the technical level of components and the quality of power station equipment.After many years of operation,the defects of power generation loss and safety hazards of some power stations have gradually emerged,and the technical transformation of such power stations has become an urgent need.Taking a 30 MW photovoltaic power station in Northwest China as an example,this paper introduces the necessity of technical transformation of the existing photovoltaic power station,puts forward suggestions on the content of technical transformation construction,and makes financial evaluation on the technical transformation project.
作者
赵维
吴安
裴刘生
刘宝林
周双全
Zhao Wei;Wu An;Pei Liu-Sheng;Liu Bao-lin;Zhou Shuang-quan
出处
《电力系统装备》
2020年第14期76-78,共3页
Electric Power System Equipment
关键词
存量光伏电站
技术改造
财务评价
existing photovoltaic power station
technical transformation
financial evaluation