110kV及以下配电网项目实施过程及可持续性评价 被引量:3

Implementation and Sustainability Evaluation for 110kV and Below Distribution Network Project
下载PDF
导出
摘要 以国网上海市电力公司A供电公司2016—2018年110kV及以下配电网项目为例,对项目实施过程中的前期决策和可研阶段进行了评价,评价可得从可研、初设两阶段看,初设与可研阶段偏差均控制在7%以内。对项目可持续性进行了评价,评价得到项目技术、管理等方面均具有可持续性;项目的规划目标、规划方法具有可重复性。 The 110kV and below distribution network project of State Grid Shanghai Pudong Power Supply Company from 2016to 2018is taken as an example.The preliminary decision-making and feasibility study stage of the project implementation process are evaluated.The evaluation can be seen from the two stages of feasibility study and preliminary design,and the deviation between the preliminary design and feasibility stage is controlled within 7%.The project sustainability was evaluated,and the evaluation showed that the project technology and management were sustainable.The planning objectives and methods of the project are repeatable.
作者 秦超逸 QIN Chaoyi(State Grid Pudong Power Supply Company,SMEPC,Shanghai 200120,China)
出处 《电力与能源》 2020年第4期525-527,共3页 Power & Energy
关键词 配电网 实施过程 可持续性 规划审查 distribution network implementation process sustainability planning review
  • 相关文献

同被引文献16

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部