摘要 为研究“拉森钢板桩+钢筋混凝土圈梁组合围堰”的工程适用性,以凤翔洲景观云桥作为依托工点,采取室内模型试验得出如下结论:①对于“素填土+卵石层+中分化泥岩”的地层,基坑开挖过程中会出现渗水现象;②桩底土压力表明钢板桩宽边中部位置受力最大;③钢板桩桩体本身受到的土压力自上而下逐渐减小。 In order to study the engineering applicability of the"Lassen steel sheet pile+reinforced concrete ring beam cofferdam",the Fengxiangzhou Landscape Cloud Bridge was used as the supporting site,and the indoor model test was adopted to draw the following conclusions:①For the"plain filling+pebble layer+medium differentiation mudstone"stratum,water seepage will occur during the excavation of the foundation pit;②The soil pressure at the bottom of the pile indicates that the central position of the steel sheet pile at the middle of the wide edge is the most stressed;③The soil pressure at the steel sheet pile body itself gradually decreases from top to bottom.
作者 王鹏 张少龙 李仁强 庞伟军 WANG Peng;ZHANG Shao-long;LI Ren-qiang;PANG Wei-jun(No.6 Engineering Co.,Ltd.of China Railway No.9 Group,Shenyang 110051,China;College of Civil Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China;Northwest Research Institute Co.,Ltd.of CREC,Lanzhou 730000,China)
出处 《价值工程》 2020年第27期105-107,共3页 Value Engineering
基金 中铁九局集团第六工程有限公司科技开发项目(FXZ-JSFW-007)。
关键词 拉森钢板桩 模型试验 施工工序 土压力 Larsen steel sheet pile model test construction process earth pressure
  • 相关文献

参考文献5

二级参考文献29

共引文献172

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部