汽轮发电机安装调试技术要点分析

Analysis of Technical Points for Installation and Commissioning of Steam Turbine Generators
下载PDF
导出
摘要 随着社会发展的速度越来越快,我国的工业在社会上也有了举足轻重的地位,而汽轮发电机作为工业领域的一个非常重要的项目,在当前这个经济快速发展的背景下,便成为了在我国的工业生产中一个不可替代的环节。所以本篇文章就着重针对于在汽轮发电机的安装调试方面进行分析,从而找到有关汽轮发电机安装调试的相应技术,进一步的提高汽轮发电机在工业领域中的使用质量。 With the increasing speed of social development,China's industry has also gained a pivotal position in society.As a very important project in the industrial field,steam turbine generator has become an irreplaceable link in China's industrial production currently under the background of rapid economic development.Therefore,this article focuses on the analysis of the installation and commissioning of the steam turbine generator,so as to find the corresponding technology for the installation and commissioning of the steam turbine generator and further improve the use quality of the steam turbine generator in the industrial field.
作者 张庆文 ZHANG Qing-wen(China Copper Southeast Copper Co.,Ltd.,Ningde 352100,China)
出处 《价值工程》 2020年第27期166-167,共2页 Value Engineering
关键词 汽轮发电机 安装调试技术 分析研究 steam turbine generator installation and commissioning technology analysis and research
  • 相关文献

参考文献4

二级参考文献5

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部