摘要 混凝土工程建设受到温度因素的直接影响,在冬季混凝土施工中,需从其拌制、运输、浇筑、养护等多个环节对其质量进行管理。论文以Z02化学武器销毁设备楼防护墙及抗爆间室专项施工项目为例,在阐述冬季混凝土施工技术控制要点的基础上,就其防护墙施工应用展开分析。期望能提升冬季防护墙混凝土施工质量,为类似工程建设提供参考。 Concrete engineering construction is directly affected by temperature factors. In winter concrete construction, it is necessary to manage its quality from multiple links such as mixing, transportation, pouring and maintenance. This paper takes the Z02 chemical weapon destruction equipment building protective wall and anti-explosion room special construction project as an example, on the basis of explaining the winter concrete construction technical control points, analyzes its application in protective wall construction. It is expected to improve the quality of the concrete construction of the protective wall in winter, and provide a reference for similar projects.
作者 熊凯 XIONG Kai(CCCC Erhangyuan Engineering Consulting Supervision Co.Ltd,Wuhan 430060,China)
出处 《工程建设与设计》 2020年第19期196-198,共3页 Construction & Design for Engineering
关键词 冬季施工 防护墙 混凝土工程 施工技术 winter construction protective wall concrete engineering construction technology
  • 相关文献

参考文献4

二级参考文献8

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部